SZ Trails: Hitch 10 Hitch Lead: Eric
Hitch Members: Dan, Jason, Steph,
Digging in a foot of mud and frequent gunshots in the background is
reminiscent of a war zone. In fact, we were doing trail maintenance
on Corral Creek during hunting season. We were all about safety
though; Bright yellow helmets and orange safety jackets. The work
centered on drainage structures: Dip Drains, Rock Water Bars and Check
Steps. When we returned for the second week, the weekend rain proved
our structures to be successful. Wildlife we saw included a
red-tailed hawk and the occasional scared deer. The totals for the
work we completed: 100' Tred Maintenance, 800' Brushing, 1 Wood Water
Bar, 4 Rock Check Steps, 13 Rock Water Bars, 28 Dip Drains.