Hitch #3 - Rattlesnake Ridge Trail - Back for more

Due to a poorly functioning brace and bit drill on Hitch #2, we returned to Big Flat Creek camp deep in the Kings Range National Conservation Area to finish the cribbing walls we had started in Hitch #2 and to create even more retaining structures. By the end of Hitch #3, we had created 200 feet of cribbing structures over the past two hitches to help sure up the Rattlesnake Ridge trail. Our hope is that the structure will be in place for many decades to come as the terrain around the trail continually shifts and landslides.

Aside from the hard work, we were able to watch our local black bears from both near and far. We were able to gorge ourselves on plenty of Thimble berries, Black berries, and Huckleberries.

The numbers:
200 feet of crib wall constructed
7.5 cubic yards of fill moved

Our Neighbor
The properly functioning drill
About to move one of our massive deadmen
Berry Patch #1 and the Berry Patch Connector in progress
Berry Patch #1 and the Berry Patch Connector completed
Wildcorps struts their stuff on the huge logs of the Berry Patch Connector crib wall
Felling a big Doug Fir for our crib walls
Slowly inching our Doug Fir stringer into place
The crew hiking in along the Kings Crest Trail
AttachmentSize
P7090047.JPG1.78 MB

Sign Up for News & Stories

Donate Now ButtonFind an Internship Button

Wildcorps - Summer 2011

SCA on the Web

FB Flickr Twitter YouTube tumblr Pinterest

May 23rd - November 23rd Project Leader Chris Bremer 208 484 3870 cbremer@thesca.org